Framing complete

| May 30, 2013

A lot has happened over the past six months. By early May, all of the frames had been cut, beveled, assembled, and all but two were installed. You can see these last two leaning on the catwalk to the left. With the framing almost complete, the size and shape of the boat are readily apparent […]

Back in the saddle

| May 5, 2013

Sorry it’s been so long since we’ve updated.  We’ll be doing monthly updates very soon now.  In the meantime, here are some progress shots from January 2013. This is the main skylight at Jeff’s workshop in California.  Pretty impressive, I’d say! The boat is almost entirely framed now.  The last frame will go in over […]