Progress through September 2016
admin | September 18, 2016
Long overdue update The crew has finished planking the interior. You may recall that this is all double planked, so it’s quite strong and stiff. Not bad looking either… Back aft, a number of sole bearers (the boat version of floor joists) have been installed. These land on wooden pads and are secured with through-bolts […]